
Before anything is built you need to know what is allowed. We check the building rights on the plot and assemble the material the committee asks for.
The submission covers drawings, documents and consultant approvals; we file it, answer the requirements and follow the application until the permit is issued.
That way the design moves forward on what can actually be approved, not on assumptions.
